青草草产国视频,欧美三页,日韩不卡手机视频在线观看,一区在线看,性感小妹,美女爆乳,林美惠子

Set Homepage   |   Add to favorites   |   Chinese   |   English
Search Products  
Wastewater grinder
 Pipeline Wastewater Grinder
 Channel Wastewater Grinder
 Single Drum Wastewater Grinder
 Double Drums Sewage Grinder
 Transmission Sewage Grinder
Solid waste shredder
MSW shredder
 Double shaft shredder
 Hook shredder
 Signal shaft shredder
 High speed Pulverizer/Granulator
Solid waste recycling system
 Municipal Solid Waste Sorting +RDF system
 Waste plastic crushing, washing, pelletizing recycling system
 Waste tire pulverizing, separating recycling system
 Printer and small appliances crushing, separating system
 Wire & Cable Pulverizing, Separating System
 Motor Stator &Rotor·Transformer Pulverizing ,Separating System
 PCB Pulverizing ,Separating System
 Copper and aluminum water tank pulverizing, separating system
Contact Us

Huanchuang (Xiamen) Technology Co.,Ltd
Phone: :+86 592 5029670
Fax: +86 592 5029673
Email:info@hcwater.com 
Add; 22 Guanri Road, Software Park 2, Xiamen, China

News
Living garbage crusher crusher, garbage, garbage sorting technology, garbage sorting, crushing machi
Edited:HuanChuang technology   Date:2014-11-28 15:25:58
The important technology of garbage crusher - garbage sorting technology
Discussion on environmental pollution, garbage classification and other environmental protection topic has not be prompted by a sudden impulse, environmental pollution can be seen everywhere, the living environment is subjected to the hitherto unknown environmental pollution and destruction, dear, do you still live well? All kinds of pollution of the air quality, the AQI index rising, so repeatedly air pollution rhythm, can let a person be at ease to go out?
Not good factory built there garbage incineration, as long as there are people living near it, although there are numerous publicity referred to waste incineration has now is how the environmental, ecological, how no pollution, but the actual situation may not be what we imagined, nor the leaders want to as, in a recent letter online the open letter to the mayor of Chen Jianhua is enough to make people have a fear of refuse incineration plant. But at the same time there how processing is not one around past problems, so how to deal with garbage, the construction of an incineration plant built, forever will not have the best answer may be in what place, is not likely to have a unified opinion.
In the waste disposal problem, draw lessons from Germany Wai governance model, the establishment of waste treatment in Counseling Supervision Committee is a very good thing. Unlike Tongde Wai governance, since waste disposal site, the public interest diversification, management will be more difficult, more difficult. In the waste disposal problem, by politics civilian interactive governance model is the solution of the city public problem of optimal method, is also the most can exert the advantage of this mode.
"The burning of pie"
1, Guangzhou City area appoint vice director Xu Jian said, Guangzhou Nissan 12000 tons of garbage, now city Xingfeng landfill in 2011 will be filled, Panyu fire Gang landfill will appear in the 2012 letter field. Guangzhou must find new ways of waste disposal. Waste incineration power generation is a direction. "Although dioxin monitoring, but Guangzhou is currently run by Li Keng incinerator furnace temperature can be real-time monitoring, as long as the temperature maintained at 850 Deg. C, coupled with the flue gas emission facilities, can control the dioxin emission."
2, Guangzhou municipal government deputy secretary general Lv Zhiyi stressed that the country had released the "China National Climate Change Program", "national urban living garbage harmless treatment facilities construction" Eleven - five "planning", "Pearl River Delta reform and development plan" are proposed to encourage land scarcity, the economically developed eastern part of the development of waste incineration technology, Guangzhou is meeting these conditions.
3, the ecological environment research center researcher at the Chinese Academy of Sciences Zheng Minghui pointed out that, with the understanding of dioxins from the shallow to the deep, the attitude of some western countries on the incineration of garbage from shake to firm. Such as Sweden in 1985 ordered the suspension of new incinerator, but in 1986 in the provisions of dioxin emissions limits, then the lifting of the ban. Also passed Dajian, installation, and then improve the historical process of building the standard Japanese refuse incinerator. Zheng Minghui thinks, refuse incineration in China though started late, but has mastered the mature technology of dioxins control. In the domestic 19 incineration plants dioxin detection, only 3 are not standard, of which there are 6 less than the most stringent emission standards in the world.
4, environmental experts said, as long as in strict accordance with the production process, waste incineration project is safe and controllable. Through the establishment of long-term management mechanism, public participation, strengthen the timely online monitoring of dioxin emission of incineration of enterprise supervision measures, waste incineration project can be reassuring and win people's trust.
 
>> Back
  Copyright © 2011-2017 Huanchuang (Xiamen) Technology Co.,Ltd. All Rights Reserved License:11006791-5   
Products:  Sewage Grinder / Pipeline Grinder / No Drum Channel Grinder / Single Drum Channel Grinder / Double Drum Channel Grinder / Transit Grinder / Solid Waste Grinder / Crossing Cutting Shredder / Vertical Shredder / Horizontal Shredder
通河县| 铜山县| 无极县| 扶余县| 惠东县| 陵川县| 常州市| 康马县| 青河县| 三亚市| 塔河县| 麻阳| 武汉市| 池州市| 遵义市| 苏尼特左旗| 鄂托克前旗| 武陟县| 师宗县| 武邑县| 碌曲县| 榆中县| 英山县| 稷山县| 侯马市| 治多县| 陵川县| 松江区| 屯昌县| 阿图什市| 阆中市| 岱山县| 从化市| 漾濞| 武城县| 五寨县| 淮北市| 双柏县| 鄂温| 五常市| 永胜县|